QD type 20-ton double-girder bridge crane installation process in steel plant

Project Summary: Installation of QD-Type 20-Ton Double-Girder Overhead Crane

Our engineering team guiding the installation of a QD-type 20-ton double-girder overhead crane at a steel factory in Bangladesh in 2014. This installation was custom-tailored for our customer’s specific operational requirements and is poised to significantly enhance productivity.

Project Objectives

The primary goals for this project included:

  • Enhanced Lifting Capacity: To handle heavier loads of up to 20 tons with ease and reliability.
  • Increased Efficiency: To improve the movement of materials within the factory, thus streamlining the production process.
  • Safety Maximization: To ensure all operations involving the crane meet stringent safety standards.

Installation Process

  1. Site Assessment: We began with a comprehensive assessment of the factory’s layout to ensure the crane would be installed in the most effective location.
  2. Custom Engineering: Given the unique demands of the environment, our team engineered bespoke components to ensure a perfect fit and seamless integration.
  3. Professional Guidance: Throughout the installation, we provided on-ground experts to offer real-time guidance to our local partners.
  4. Testing & Commissioning: Post-installation, rigorous tests were conducted to ensure the crane operated within all expected parameters before officially commissioning it for use.

Results & Impact

  • Operational Excellence: The newly installed overhead crane has already shown a remarkable improvement in the movement of heavy materials.
  • Increased Production: The efficiency brought by the crane installation has augmented the factory’s overall production capacity.
  • Safety Compliance: All operations with the crane are fully compliant with safety regulations, ensuring a secure work environment.

Future Support

We remain committed to providing ongoing support and expertise to maintain optimal functionality of the crane and help our customers achieve their operational goals.

Through meticulous planning, custom engineering, and dedicated support, this project stands as a testament to our customer-centric approach and technical proficiency. With this state-of-the-art crane now in operation, the steel factory is well-positioned for continued growth and increased efficiencies.